Oil & Gas
Cold-cutting equipment for pipeline construction, refinery turnarounds and offshore platform shutdowns — spark-free, HSE-compliant, ASME / API ready.
Oil & gas pipework operates under three constraints that decide every equipment choice on the project: the parent metal cannot tolerate heat input, the hazardous area cannot tolerate sparks, and the shutdown window cannot tolerate rework. Every machine on this page is designed around those three constraints together — not one at a time.
What the work actually looks like
Pipeline construction, refinery turnarounds and offshore platform maintenance share the same workflow: somebody has to cut a piece of installed pipe, prepare the new bevel, and weld a new spool into a line that is already in service or about to be. The pipe is rarely in a convenient position. The clearance around it is usually not what the drawing shows. The permit office is usually slower than the crew.
That picture explains why three machine families dominate this industry: split-frame OD-mount bevelers for installed pipework, cold orbital saws for cutting the failed section out, and portable flange facers for the in-line valve and manifold work that always comes with it.
Why cold cutting is mandatory here
Sour-service carbon (NACE MR0175 / ISO 15156), low-temperature carbon (LTCS), 304/316L stainless, duplex and Inconel piping all have published service envelopes that assume the parent metal was not heated at the bevel. Plasma cutting leaves a 2–4 mm heat-affected zone on carbon steel and 3–6 mm on austenitic stainless. The HAZ is not covered by the WPS qualification — the standard remedy is to mill or grind it off before welding, which converts the “fast” plasma cut into a slower-than-cold-cutting workflow once rework is counted.
A cold mechanical cut puts zero heat into the parent metal. The cut surface matches parent metallurgy exactly, and the cut geometry comes off the machine within ASME B16.25 / B31.4 tolerance ready to weld without an intermediate grinder pass. We unpack the full trade-off in cold cutting vs hot cutting.
Pipeline construction and tie-ins
Cross-country pipeline construction is volume work — hundreds to thousands of joints per project, predictable wall and material, with crews moving along the right-of-way. The bottleneck is rarely complexity; it is how long the crew waits between joints.
Our recommendation for typical line-pipe construction work (Ø 168 – 1620 mm carbon steel, API 5L X52 to X70) is a split-frame OD-mount beveler with a V head as standard and a J head for the heavier walls. Concentricity holds to ± 0.15 mm on out-of-round pipe, which is the real-world condition after transport — see the split-frame clamshell beveler for the OD-range table, and the pipe beveling machines category for the full range.
For the cutter side of the same tie-in, a planetary orbital pipe saw severs the line cold so the new spool can be beveled and welded on the same shift. Whether to run V or J on the heavier walls depends on project economics — see V vs J prep economics.
Refinery turnarounds and shutdowns
A TAR shift on a refinery costs the operator tens of thousands of US dollars per hour for the unit being down. Every hour spent waiting on a hot-work permit, every joint that comes back for rework, lands on that meter. The honest reason to run cold-cutting equipment in a refinery is not the metallurgy — it is the schedule.
Typical permit overhead I have seen on TAR work:
- Permit issuance: 2–4 hours of dead crew time per shift start.
- Gas tests during active work: every 2 hours.
- Fire watch: one extra person per crew, full shift.
Cold cutting removes all of that. A cam-type self-centering beveler or split-frame on the same shift covers the bevel work; a portable flange facer in parallel covers any RTJ or RF flange in the unit.
For the broader pneumatic-vs-electric drive decision in Zone 1 areas, see pneumatic machining in oil & gas safety.
Offshore platform maintenance
FPSOs, fixed platforms and subsea tie-in modules add two constraints on top of the refinery picture: limited deck space, and the difficulty of mobilising heavy equipment to remote locations. Portable bevelers sized for what the crew can carry in a tool basket make this work viable. So does the fact that one machine handles severing, beveling and end-prep in the same setup — fewer machines to mobilise, fewer spares to stock.
For the related flange-side work — RTJ groove refurbishment, BX flange service on wellheads — see our flange facing machines category and the portable flange facer spec.
What ships on a typical oil & gas project
A working equipment package for a mid-size pipeline tie-in or refinery TAR project typically pairs:
- A split-frame OD-mount beveler sized for the project pipe range, with V + J head pack.
- An orbital pipe saw or split-frame cutter for the sever side.
- A portable flange facer with R / RX / BX tooling for the in-line flange work.
- Pneumatic versions of all of the above for hazardous-zone work.
- Spare insert and tooling pack matched to the WPS material list.
We deliver direct, with calibration certificates per unit, spare parts held in Shenzhen for the life of the machine — including frames built before 2015. For sizing against your specific WPS and project scope, send the spec to the quote form or talk to an engineer.
Built for oil & gas work.
Questions we get on oil & gas projects.
Why is cold cutting mandatory for oil & gas pipework?
Can the bevelers and cutters work without a hot-work permit?
What OD range do you cover for pipeline tie-ins?
Do you handle RTJ flange refurbishment in the field?
How is your equipment qualified for export to refineries and EPC contractors?
Get a quote within 24 hours.
Send us your spec sheet, pipe schedule, or drawing — our engineers reply with pricing, lead time, and recommended models.
- 01Send specs & drawings
- 02Receive quote within 24h
- 03Confirm & manufacture