Zero hot work
No spark, no flame, no permit chain — safe in Zone 1 / 2, operating refineries and offshore decks.
Every Kedes machine is engineered for one of these five environments. Pick the industry that matches your project and we'll show you the matching equipment families and the standards they meet.
Whether the job is a 36" pipeline tie-in or a 6 mm sanitary tube, project teams repeatedly ask for the same four things. Cold-cutting equipment is built around them.
No spark, no flame, no permit chain — safe in Zone 1 / 2, operating refineries and offshore decks.
No HAZ on sour, stainless, duplex, Inconel or high-purity tubing. Parent material stays parent material.
Split-frame, ID-mount and portable designs — no need to lift, remove or transport the workpiece.
Geometry to ASME B16.25, EN ISO 9692-1 and API 1104. Documentation pack ships with every unit.
Cold-cutting equipment for pipeline construction, refinery turnarounds and offshore platform shutdowns — spark-free, HSE-compliant, ASME / API ready.
Boiler header replacement, water-wall panel work, heat-exchanger tube preparation and turbine-side flange refurbishment for thermal, nuclear and combined-cycle plants.
Hull-plate edge preparation, manifold and engine-room piping, deck spool fabrication and onboard repair work — to LR, DNV, ABS and CCS class requirements.
Tube squaring and closed-head orbital welding for semiconductor UHP gas lines, pharmaceutical process tubing and biotech fluid systems — ASME BPE, SEMI F70 / F78 compliant.
Weld preparation for WFI, clean steam, CIP/SIP and product transfer tubing — ASME BPE surface finish, orbital-ready tube ends, and the material traceability a validation package needs.
Particle-free tube preparation for fab gas and chemical distribution — SEMI F70 / F78 practice, electropolished surface preserved, and tube ends square enough for a closed orbital head inside a cleanroom protocol.
Pressure-vessel shell prep, wind-tower section welding, bridge and structural fabrication, dross removal — milled bevels with no slag, no grinding rework, ASME / AWS / EN compliant.
Shell plate and nozzle weld preparation for ASME VIII code vessels, tanks, heat exchangers and boilers — machined bevels that pass RT and UT without a dressing pass, on plate up to 150 mm.
A quick cross-reference. Tap a family name to open its full page; tap an industry to see the recommended models in context.
Send drawings, pipe / plate dimensions, material grade and site constraints. NDA on request.
Engineering proposes 1–2 sized models with datasheets, FOB / CIF pricing and lead time — within one shift.
Fixtures, gearbox, electrical cabinet and final assembly under one roof in Shenzhen with QC checkpoints.
Sea or air freight, documentation pack, video commissioning, on-site training optional.
Five questions we hear from procurement, EPC and project engineers most weeks. Anything else? Open WhatsApp or email contact@kedesmachine.com.
Send the scope of work — pipe / plate dimensions, material grade, bevel geometry, in-situ vs shop, environmental constraints (offshore, hazardous zone, cleanroom). We size one or two models from the matching family, share datasheets, FOB / CIF pricing and lead time within one working shift.
Yes. We supply turnkey kits to EPCs (tooling, blades, spares for the project duration) and discounted fleet pricing to rental houses. We also handle private-label / OEM branding, language localisation and voltage variants.
Standard delivery includes English operator manuals and video commissioning over WhatsApp / Teams. On-site commissioning and operator training is available globally on quotation — typical visit is 3–5 days.
Machines ship with material certificates, dimensional inspection reports and electrical test records. For oil & gas and power we provide ASME B16.25 / EN ISO 9692-1 geometry verification on first-article samples. For high-purity we issue surface roughness reports on tube facing tooling.
Catalogue units ship in 2–3 weeks. Custom voltage, tooling head, or branding adds 4–6 weeks. Sea freight from Shenzhen to Europe / Middle East is 28–35 days; air freight on small units 5–7 days.
Pipe / plate dimensions, material grade, bevel geometry and site environment is enough. Our engineers reply within one working shift with a matched model and lead time.